Space Engineers

Space Engineers

SMU - ICD Service Platform (P) V4.0
Showing 1-3 of 3 entries
Update: 25 Jan, 2016 @ 7:49pm

Added some updated images to reflect the current version.

Update: 25 Jan, 2016 @ 1:20pm

FOR THIS UPDATE V.4.0

a) Made the airlock light into a status light, it will flash while decompressing or pressurizing.
b) Added 4x more Solar Panels, currently summing a total of 12 Solar Panels.
c) Added a Defense System composed out of 4x Missile Turrets and 2x Interior Turrets.
d) Added 3x more Batteries, currently summing a total of 13 batteries.
e) Added 9x more Oxygen Tanks, currently summing a total of 23 O2 Tanks.
f) Loaded the new G-Menu configurations into the control seats
g) Fixed some screens that were not displaying information.
h) Fixed the assemblers not getting ingots to work with.

PRESENT STATE:

Personnel: 6x ( 2 pilots, 2 engineers, 2 cargo managers )
Bridge: SMU Double Deck Bridge
Computer System: ( 3x AI-Core Arrays, 12x Timers, MMaster Automatic LCDs. )
Life Support System: ( 1x Full Medbay, 2x O2 Generator, 23x Oxygen Backup Tanks )
Oxygen System: ( 1x O2 Generator, 2x Vents, Bridge Pressurization System )
Airlock System: ( 1x O2 Tank, 1x Vent, 1x Status Light )
Energy System: ( 1x Small Reactors, 13x Batteries, 12x Solar Panels )
Cargo System: ( 10x Large Cargo Array, ICD 5x Connector Setup, 2x Resupply Connectors )
Supply System: ( 1x Large Cargo Array, 1x Large Hydrogen Tank, 4x Resupply Connectors )
Repair System: ( 8x Assemblers accessible from Landing Platform )
Defense System: ( 4x Missile Turrets, 2x Exterior Turrets )
Personnel Storage: ( 2x Small Containers within Bridge. )
Remote Control Module: If there happens to be no crew available on the platform, one can remotely setup the platform beacon and landing lights for a safe approach.

Update: 14 Jan, 2016 @ 8:26am

For this updated I added or changed the following:

1) Removed 1x Large Cargo Container from the Supply space.
2) Added 1x Large Hydrogen Tank instead
3) Added 1x Battery ( Now there is a total of 10 )
4) Added 1x Oxygen Generator ( for convenient O2 bottle fill ups )
5) Added G-Menus to all seats.
6) Added Remote Control module ( for the ICD to prepare the platform for landing if no crew is present )

PRESENT STATE:

Personnel: 6x ( 2 pilots, 2 engineers, 2 cargo managers )
Bridge: SMU Double Deck Bridge
Computer System: ( 3x AI-Core Arrays, 12x Timers, MMaster Automatic LCDs. )
Life Support System: ( 1x Full Medbay, 2x O2 Generator, 14x Oxygen Backup Tanks )
Oxygen System: ( 1x O2 Generator, 2x Vents, Bridge Pressurization System )
Airlock System: ( 1x O2 Tank, 1x Vent )
Energy System: ( 1x Small Reactors, 10x Batteries, 8x Solar Panels )
Cargo System: ( 10x Large Cargo Array, ICD 5x Connector Setup, 2x Resupply Connectors )
Supply System: ( 1x Large Cargo Array, 1x Large Hydrogen Tank, 4x Resupply Connectors )
Repair System: ( 8x Assemblers accessible from Landing Platform )
Personnel Storage: ( 2x Small Containers within Bridge. )
Remote Control Module: ( if there is no crew on the ISP, you can set it up for landing remotely from any ICD )