Workers & Resources: Soviet Republic

Workers & Resources: Soviet Republic

42 ratings
Nuclear centralized temporary storage facility
2
   
Award
Favorite
Favorited
Unfavorite
Building
Buildings (by category): Storage, Industrial facility
File Size
Posted
Updated
8.093 MB
10 Jan @ 7:21am
2 Apr @ 1:49pm
6 Change Notes ( view )

Subscribe to download
Nuclear centralized temporary storage facility

Description
Centralized temporary storage, to safely store large quantities of nuclear waste, is based on the built by COVRA on Nieuwdorp.

Workers needed 50
Road access 1
Loading and unloading area 2
Pedestrian access 4
Factory connections 6
Rail connections 2
Nuclear fuel store 500t
Nuclear waste store 500t
Heating off


For its operation, the containers must be unloaded and reprocessed into used fuel for storage.

Note: If you want to empty it, you must use vehicles prepared to carry nuclear waste, like this https://steamproxy.net/sharedfiles/filedetails/?id=2838612267 and reprocess it again in containers in a suitable facility, such as a nuclear power plant.


GROUNDWORKS

Gravel 388.5
Asphalt 395.8
Concrete 425.3
Workers 3650

SKELETON CASTING

Gravel 365.4
Concrete 452.6
Steel 170.2
Bricks 140.6
Prefab panels 276.4
Workers 6539

STEEL LAYING

Steel 46.5
Mechanical components 8.7
Electronic components 4.8
Workers 540




Almacen temporal centralizado, para almacenar de forma segura grandes cantidades de resiudos nucleares, esta basado en el construido por COVRA en Nieuwdorp.

Trabajadores 50
Conexiones de carretera 1
Zonas de carga y descarga 2
Conexiones peatonales 4
Conexiones de fabrica 6
Conexiones de ferrocarril 2
Almacen de combustible nuclear 500t
Almacen de residuos nucleares 500t
Calefaccion desabilitada

Para su funcionamiento se deberan descargar los contenedores y reprocesarlo en combustible usado para su almacenaje.
Nota: En caso de querer vaciarlo se debera usar vehiculos preparadaos para llevar resiudos nucleares, como este https://steamproxy.net/sharedfiles/filedetails/?id=2838612267 y reprocesarlo de nuevo en contenedores en una instalacion adecuada, como, por ejemplo una central nuclear.


PREPARATORIOS

Grava 388.5
Asfalto 395.8
Hormigon 425.3
Dias de trabajo 3650

TENDIDO DE HORMIGON

Grava 365.4
Hormigon 452.6
Acero 170.2
Ladrillos 140.6
Paneles prefabricados 276.4
Dias de trabajo 6539

TENDIDO DE ACERO

Acero 46.5
Componentes mecanicos 8.7
Componentes electronicos 4.8
Dias de trabajo 540
5 Comments
Jaronalsgamerr 17 hours ago 
finaly a Dutch building
gonzaldd  [author] 1 Jul @ 3:52pm 
I have always liked those old posters, especially those related to space or industrial themes..., in principle I am not going to make more variations, but if anyone wants to make skins for it with the posters or something else, they are welcome.
GreezyHammer 1 Jul @ 10:20am 
That guy you hate 15 Jan @ 11:35am 
Yes... temporary
vajeeking 11 Jan @ 3:59pm 
that is pretty close to real building... https://www.covra.nl/en/radioactive-waste/storage/