This content requires the base game JR EAST Train Simulator on Steam in order to play.

All Reviews:
Positive (22) - 100% of the 22 user reviews for this game are positive.
Release Date:
15 Nov, 2022
Developer:
Tags

Sign in to add this item to your wishlist, follow it, or mark it as ignored

Check out the entire East Japan Railway Company franchise on Steam

Downloadable Content

This content requires the base game JR EAST Train Simulator on Steam in order to play.

Buy JR EAST Train Simulator: Oito Line (Matsumoto to Minami-Otari) 211 series

HK$ 229.99
 

About This Content

The Oito Line is a 105.4 km long line connecting Matsumoto Station in Nagano Prefecture to Itoigawa Station in Niigata Prefecture. The 70.1 km route between Matsumoto Station and Minami-Kotani Station, which is under the jurisdiction of JR East, is well-known as a stop for customers visiting the mountain climbing and snow resort areas represented by Shinano-Omachi and Hakuba. The "Super Azusa" limited express train runs directly from Shinjuku Station, and the line is also used as a commuter and school route in the Matsumoto area. From the driving scenery, you can experience the changing scenery of Shinshu from winter to spring with the magnificent snow-capped Northern Alps, cherry blossoms along the tracks, and rice paddies filled with water for the summer.

Highlights

  • Azusa River Railroad Bridge / Shimatakamatsu to Azusa Bridge
     Cross the Azusa River flowing from the Northern Alps.
  • Northern Alps / Azumi-Kutsugake~Shinano-Tokiwa
     You will enjoy the contrast between winter and spring with the snow-capped Northern Alps and beautifully blooming cherry blossoms.
    [Shinano-Omachi Station
     Shinano-Omachi Station is the gateway to the Tateyama-Kurobe Alpine Route, a mountain tourism route that runs through the Northern Alps to Toyama. The station, with its hut-like station building, rail bridge, and spacious interior, conveys the bustle of the area. 

Route information

  • Section: Oito Line Matsumoto→Minami-Otari Outbound
  • Total length: 70.1 km
  • Number of stations: 33
  • Safety equipment: ATS-Ps

Train schedules that can be operated

  • Train number: 5329M
  • Type/Destination: Local Train to Minami-Otari
  • Station section that can be operated: Matsumoto to Minami-Otari
  • Type of train: Series 211, 3 cars
  • Responsible for real voice train announcements: Matsumoto train crew depot

  • Train number: 3113M
  • Type/Destination: Local Train to Hotaka
  • Station section that can be operated: Matsumoto to Hotaka
  • Type of train: Series 211, 3 cars
  • Responsible for real voice train announcements: Matsumoto train crew depot

  • Train number: 3241M
  • Type/Destination: Local Train to Shinano-Omachi
  • Station section that can be operated: Matsumoto to Shinano-Omachi
  • Type of train: Series 211, 3 cars
  • Responsible for real voice train announcements: Matsumoto train crew depot

System Requirements

    Minimum:
    • Requires a 64-bit processor and operating system
    • OS: 64-bit Windows 10
    • Processor: Intel Core i (6th generation) 4Cores or AMD Ryzen (1st generation) 4Cores
    • Memory: 16 GB RAM
    • Graphics: NVIDIA GeForce GTX 10 series (VRAM 2GB)
    • DirectX: Version 11
    • Storage: 20 GB available space
    • Additional Notes: need resolution 1920×1080@60Hz,DirectX 11.3
    Recommended:
    • Requires a 64-bit processor and operating system
    • OS: 64-bit Windows 10
    • Processor: Intel Core i5-6500 or AMD Ryzen 5 1400
    • Memory: 16 GB RAM
    • Graphics: NVIDIA GeForce GTX 1060
    • DirectX: Version 11
    • Storage: 20 GB available space

More DLCs from this game

More from East Japan Railway Company

Customer reviews

Review Type


Purchase Type


Language


Date Range
To view reviews within a date range, please click and drag a selection on a graph above or click on a specific bar.

Show graph



Display As:
Show graph
 
Hide graph
 
Filters
Excluding Off-topic Review Activity
Playtime:
Loading reviews...