Frissítés: 2021. nov. 16. @ 15:32

- New ground version 1 (more versions to come) thanks to Steam user FoxyplayzYT

Frissítés: 2021. nov. 7. @ 14:47

- Re-added "map" tag to info.txt

Frissítés: 2021. nov. 7. @ 8:14

- Added ragdolls throughout the map

Frissítés: 2021. okt. 23. @ 15:56

- Began making the new basement (Work in progress)

Frissítés: 2021. okt. 11. @ 16:14

- Added large propane tanks beside Building 2

Frissítés: 2021. okt. 7. @ 2:52

- Updated the version checker to check for the new 0.8.0 update

Frissítés: 2021. okt. 5. @ 4:12

- Removed the tags on the valves in the basement -Murdoc
- Changed the look of the steam coming out of said valves when you turn them, looking more realistic -Murdoc

Frissítés: 2021. okt. 3. @ 7:41

- Top of the cage for the reactor can now be opened
- Added a hook on a hinge to keep the top opened

Frissítés: 2021. aug. 23. @ 5:07

- Added the large version of the dump truck. Placed it in the sand pit

Frissítés: 2021. aug. 5. @ 6:51

- Added huge lid to the reactor. It flies upward and spins in the air before crashing back down, after the reactor explodes;

- Put some fuel rods inside the reactor. Supposed to blow out everywhere after the reactor explodes. Might have increased lag.