Train Simulator Classic 2024

Train Simulator Classic 2024

Không đủ lượt đánh giá
Engineering Closures - part 3 (9P42)
   
Giải thưởng
Yêu thích
Đã yêu thích
Bỏ thích

Đăng ký để tải xuống
Engineering Closures - part 3 (9P42)

Mô tả
The route between Springhead junction, near Gravesend, and Dartford sidings is closed for engineering work.

With this going on, Thameslink are operating a shuttle at each end of the Rainham to Luton service as well as a diverted
service once an hour.

You are now tasked with taking a diverted service to Luton, and in this section will be working as far as London Blackfriars.

70 minutes, medium difficulty.

This scenario has been created using a calculation on the likely timings running via the Chatham mainline and Herne Hill to Blackfriars and with the Realtime Trains data for an autumn afternoon.
6 bình luận
dur 29 Thg06 @ 6:15am 
Ah okay, thanks for replying and cheers for the great routes you published <3
gazra13  [tác giả] 29 Thg06 @ 5:02am 
Sorry dur, there is no part 4. It was planned for an invalid route, so could abandoned.
dur 29 Thg06 @ 3:23am 
Beautiful Route, enjoyed every second, nice AI and relaxing drive.
But can I ask where Part 4 is by any chance? I cant wait to drive on that scenario
tonix 12 Thg03 @ 11:53am 
rainy but very nice szenario with good AI.
thank you
pjohnandlyns 11 Thg03 @ 7:10am 
A good end to the set. No problems at all.
Brummie 11 Thg03 @ 3:34am 
All ran well without issue. Fantastic scenario, loved how the yellow signals intensified the closer you get to London. Well done and many thanks.