Train Simulator Classic 2024

Train Simulator Classic 2024

評價次數不足
Engineering Closures - part 3 (9P42)
   
獎勵
加入最愛
已加入最愛
移除最愛

訂閱以下載
Engineering Closures - part 3 (9P42)

描述
The route between Springhead junction, near Gravesend, and Dartford sidings is closed for engineering work.

With this going on, Thameslink are operating a shuttle at each end of the Rainham to Luton service as well as a diverted
service once an hour.

You are now tasked with taking a diverted service to Luton, and in this section will be working as far as London Blackfriars.

70 minutes, medium difficulty.

This scenario has been created using a calculation on the likely timings running via the Chatham mainline and Herne Hill to Blackfriars and with the Realtime Trains data for an autumn afternoon.
6 則留言
dur 6 月 29 日 上午 6:15 
Ah okay, thanks for replying and cheers for the great routes you published <3
gazra13  [作者] 6 月 29 日 上午 5:02 
Sorry dur, there is no part 4. It was planned for an invalid route, so could abandoned.
dur 6 月 29 日 上午 3:23 
Beautiful Route, enjoyed every second, nice AI and relaxing drive.
But can I ask where Part 4 is by any chance? I cant wait to drive on that scenario
tonix 3 月 12 日 上午 11:53 
rainy but very nice szenario with good AI.
thank you
pjohnandlyns 3 月 11 日 上午 7:10 
A good end to the set. No problems at all.
Brummie 3 月 11 日 上午 3:34 
All ran well without issue. Fantastic scenario, loved how the yellow signals intensified the closer you get to London. Well done and many thanks.