Train Simulator Classic 2024

Train Simulator Classic 2024

十分な評価がありません
Engineering Closures - part 3 (9P42)
   
アワード
お気に入り
お気に入り
お気に入りから削除

サブスクライブしてダウンロード
Engineering Closures - part 3 (9P42)

解説
The route between Springhead junction, near Gravesend, and Dartford sidings is closed for engineering work.

With this going on, Thameslink are operating a shuttle at each end of the Rainham to Luton service as well as a diverted
service once an hour.

You are now tasked with taking a diverted service to Luton, and in this section will be working as far as London Blackfriars.

70 minutes, medium difficulty.

This scenario has been created using a calculation on the likely timings running via the Chatham mainline and Herne Hill to Blackfriars and with the Realtime Trains data for an autumn afternoon.
6 件のコメント
dur 6月29日 6時15分 
Ah okay, thanks for replying and cheers for the great routes you published <3
gazra13  [作成者] 6月29日 5時02分 
Sorry dur, there is no part 4. It was planned for an invalid route, so could abandoned.
dur 6月29日 3時23分 
Beautiful Route, enjoyed every second, nice AI and relaxing drive.
But can I ask where Part 4 is by any chance? I cant wait to drive on that scenario
tonix 3月12日 11時53分 
rainy but very nice szenario with good AI.
thank you
pjohnandlyns 3月11日 7時10分 
A good end to the set. No problems at all.
Brummie 3月11日 3時34分 
All ran well without issue. Fantastic scenario, loved how the yellow signals intensified the closer you get to London. Well done and many thanks.