Rail Route

Rail Route

29 次評價
England Southeastern line (London area)
   
獎勵
加入最愛
已加入最愛
移除最愛
檔案大小
發佈於
更新時間
1.348 MB
2022 年 8 月 26 日 上午 8:32
2022 年 8 月 29 日 上午 11:48
18 項更新註記 (檢視)

訂閱以下載
England Southeastern line (London area)

在 Gilbertson 的 1 個收藏中
English Southeastern Line
3 個項目
描述
*The map has been updated and repaired,it can be completed without deduct points,the full marks is 29150,but you don't need to pursue full masks,it has 10 fault tolerant points to achieve 100%.
There may be a bug when loading the large map in this game,the loading interface may display 'map loading error',but in fact the game is still loading the map.

Welcome to the South East London.There are two main lines through Kent : South Eastern Main Line and Chatham Main Line,South Eastern Main Line and Chatham Main Line meet at Chislehurst and Lewisham,where the trains can be diverted to another main line,westbound to Charing Cross/Cannon Street or Victoria/Blackfriars or southbound to Sevenoaks or Chatham.in Brixton and Shortlands,the Chatham Main Line is divided into Bromley South Line and Catford Loop Line,the branch of Chatham Main Line in the south is called Bromley South Line,at Herne Hill station both Southeastern and Thameslink trains calling at here,the Southeastern express trains to/from Dover and Ramsgate pass through without stopping,the Thameslink southbound to Tulse Hill and head to the Sutton Loop Line,or northnound through Blackfriars into East England,and the Southeastern trains continue along the Chatham Main Line(note that there are trains do not follow the above at rush hour);The Chatham Main Line branch in the north is called the Catford Loop Line,where most of the Southeastern trains run non-stop except for Denmark Hill.Denmark Hill is served by the Southeastern,Thameslink and London Overground,in general,the South London Line are the southern pair of tracks running to Victoria,the Catford Loop Line are northern pair running to Blackfriars and Victoria.
London Bridge is a very busy and complex station,served by the Thameslink,the Southeastern and the Southern,the train frequency during peak time reach 170+ per hour.The station has been further developed,two Thameslink platforms are added,the number of platforms has changed to 9,in the past the Thameslink and the Southeastern shared the 5 and 6 platform at that time,which caused the two platforms to be extremely busy.London Bridge is also the terminus of the Southern,they are terminated using platforms in the southern area of London Bridge.The railway going straight to the right from Platform 1&2 of London Bridge is the Greenwich Line,it is the first steam railway in London.The Kidbrooke and the Lee are on the Bexleyheath Line and the Sidcup Line,the Greenwich Line,Bexleyheath Line and the Sidcup Line are connected in the east,trains can cycle between these lines.
At the time of this map,London Bridge had already been refurbished,the Thameslink has a dedicated platform,and the Hayes Line is almost entirely taken over by the Bakerloo Line,Charing Cross and Cannon Street were no longer serving this line,which greatly reduces the difficulty of dispatch(though Herne Hill is still planning).
1 則留言
pga1965 8 月 26 日 上午 6:17 
when there is a train on the underpass line between Lewisham #3/4 to Nunshead, and traffic passes over it between St. James' and Hither junction they crash as though both are on the same level, instead of grade separated